*Usually ships within 7 to 14 days.
- Puts high magnitude pulse between the neutral/ hot leg or hot leg/ hot leg for any secondary service (120V, 208, 277, 480V)
- It cannot be fooled by telephone and cable television bonding often missed by continuous loading devices
- Identify bad conductor(s) from the transformer to the meter base
- Indicate integrity of neutral conductor to prevent excessive house ground current
- Locate bad connectors on overhead spans
*Usually ships within 7 to 14 days.
- Puts high magnitude pulse between the neutral/ hot leg or hot leg/ hot leg for any secondary service (120V, 208, 277, 480V)
- It cannot be fooled by telephone and cable television bonding often missed by continuous loading devices
- Identify bad conductor(s) from the transformer to the meter base
- Indicate integrity of neutral conductor to prevent excessive house ground current
- Locate bad connectors on overhead spans